Topics getting the most attention in Green public meetings, ranked by how frequently they come up.

13 issues (filtered)10 topics
HighDevelopment

New Dairy Queen on Massillon Road

A new Dairy Queen is phase one of a three-building project on Massillon Road. The Oak Clinic has a purchase agreement for phase two, and a traffic impact study will be required once future phases firm up.

3 mentions (1 this month)Last discussed Oct 27, 2026
MediumDevelopment

Organic Smiles Site Plan

A new Organic Smiles business proposed for 808 E. Turkeyfoot Lake Road went before the board for site plan review. The review covers the building plans, elevations, and landscaping in a B-1 business zone.

2 mentions (2 this month)Last discussed Oct 21, 2026
MediumDevelopment

Legacy Point Identification Sign

A new ID sign for Heritage Landscape Supply at 4940 Aultman Road needs design tweaks — a white split block base matching the building, a verified 10-foot setback from the road, and year-round landscaping. The sign company says revised plans will be ready for the Planning and Zoning Commission in two weeks.

3 mentions (2 this month)Last discussed Oct 21, 2026
LowDevelopment

A&C Naturals retail operation at 4725 Massillon Road

A business owner sought signage approval and a conditional use to operate a retail establishment in the B-3 district on Massillon Road, a major commercial corridor.

1 mentionLast discussed Sep 16, 2026
LowDevelopment

A&C Naturals Signage and Possible Setback Variance

A&C Naturals' sign at 4725 Massillon Road may sit too close to the road right-of-way — a city inspector measured about 4 feet 8 inches from the sidewalk, and the code requires 5 feet. The owner must get a survey and may need to apply for a variance, though the pre-existing sign and stone base could help her case.

1 mentionLast discussed Sep 2, 2026
MediumDevelopment

TIF exemptions for Chick-fil-A and Brenneman projects

A 30-year TIF on a roughly $1.8 million medical spa and financial office building at 4228 Town Crossing, feeding the Town Park TIF including the planned Burgess–Town Park connector.

8 mentionsLast discussed Aug 25, 2026
HighDevelopment

Redwood Apartment Neighborhoods proposal on Stein Road

Redwood wants to build about 115 single-story rental units, mostly two-bedroom with attached garages, on vacant industrial land. The project targets empty-nester renters and includes a new public connectivity road between Miller Park and Stein Roads.

1 mentionLast discussed Aug 19, 2026
MediumDevelopment

Oak Clinic's new Green facility

The Oak Clinic will build a 30,000 sq ft MS clinic at 1928 Burgess Drive by 2028, bringing 600+ patients a month to Green. It asked the city to remove the boulevard at Massillon/Burgess and build a connecting road to Town Park Blvd for safety.

1 mentionLast discussed Aug 11, 2026
MediumDevelopment

Friendly Express gas station at S. Main and SR 619

A former radio building on a tight corner lot is being converted into a Friendly Express gas station and convenience store. The owner agreed to shave 20 feet off the building and drop the drive-thru so trucks and cars with trailers can actually move around the pumps — a fix the board liked.

6 mentionsLast discussed Jul 15, 2026
HighDevelopment

Redevelopment of vacant former Rite Aid corner

The long-vacant Rite Aid at South Main and Route 619 — a gateway intersection the city has been watching — will become a Friendly Express gas station and convenience store. Commissioners see it as a win for a blighted corner, but want maintenance standards raised along Main Street.

1 mentionLast discussed Jul 15, 2026
HighDevelopment

Horse farm development approved by council 4-3

Noble reported the horse farm land development passed council 4-3 — he, DeVitis and Speight voted no. About 100 new homes are coming, and the project still needs final plat approval.

1 mentionLast discussed Jul 15, 2026
MediumDevelopment

Chapel in Green expansion

The church is adding a 6,000-square-foot, 400-person community room with outdoor-access restrooms, aimed at smaller events, special-needs ministry and community gatherings.

2 mentionsLast discussed Jun 17, 2026
MediumDevelopment

Southwood Drive Phase 2 Construction

The dedication plat and a $1.23 million Cavanaugh contract would finish the Southwood Drive connection between Tabbs Drive and Arlington Road, easing pressure on Bettler Road — especially during Arlington construction.

2 mentionsLast discussed May 12, 2026